Vognvegen – M.Sandbergsveg, Intersection

The project involved the preliminary and complete design of an intersection, access road and parking lot, along with surface water utilities and a new main pipeline for surface water out of the area.

VSO’s role in the project was:

  • Roads and pathways design.
  • Sound barrier design.
  • HVAC systems design.

Project period: 2011-2012.

Client: Holmestrand kommune.