A Temporary Fire Station at Suhms Gate 19

The project involves the design of a temporary fire station, staff facilities and a storage for OBRE. Size ~1150 m2.

VSO is responsible for:

  • Geotechnical design.
  • Landscape design.
  • Structural physics design.
  • Fire safety design.

Project period: 2020

Client: Omsorgsbygg Oslo KF, Norway.